Hultberg, Malin
- Institutionen för biosystem och teknologi, Sveriges lantbruksuniversitet
Nutrient removal from the effluent of an anaerobic moving bed biofilm reactor (AnMBBR) treated with microalgae was evaluated. Algal treatment was highly efficient in removal of nutrients and discharge limits were met after 3 days. Extending the cultivation time from 3 to 5 days resulted in a large increase in biomass, from 233.3 +/- 49.3 to 530.0 +/- 72.1 mg L-1, despite nutrients in the water being exhausted after 3 days (ammonium 0.04 mg L-1, orthophosphate
AnMBBR; Chlorella spp.; Fatty acids; Nutrient removal; Scenedesmus spp.
Bioresource Technology
2016, volym: 207, sidor: 19-23
Utgivare: ELSEVIER SCI LTD
SDG6 Rent vatten och sanitet för alla
SDG11 Hållbara städer och samhällen
Annan naturresursteknik
Mikrobiologi
https://res.slu.se/id/publ/76801